Multifamily Energy Code Verification
ECC / HERS Testing for Multifamily Projects in Northern California
Multifamily projects are where the 2025 California Energy Code changes are felt the most.
With the transition from HERS to the ECC Program, multifamily construction now has stricter requirements for ventilation, insulation, duct systems, hot water piping, refrigerant charge, and quality assurance oversight.
Pacific Airflow specializes in ECC / HERS field verification for multifamily construction across Northern California, working directly with builders, HVAC contractors, insulation crews, and project managers to keep large projects moving smoothly toward inspection approval.
Why Multifamily Projects Require Specialized ECC / HERS Support
Multifamily projects are different from single-family homes because:
Sampling protocols are heavily scrutinized
Ventilation rules changed significantly under the 2025 code
Domestic hot water pipe insulation is now a mandatory verification
Compartmentalization requirements are stricter
Quality Assurance audits occur more frequently
Data accuracy and documentation standards are higher under ECC
A small mistake multiplied across 40, 80, or 200 units becomes a major delay.
We help prevent that.
2025 Code Changes That Impact Multifamily
Under the 2025 ECC code, multifamily projects must now comply with:
Ventilation Changes
Exhaust-only ventilation is no longer allowed
Only supply-only or balanced ventilation systems are permitted
Compartmentalization is now required regardless of ventilation type
Domestic Hot Water (NEW Mandatory)
All multifamily hot water piping must be verified insulated
Heat Pumps & Refrigerant Verification
Heat pump refrigerant charge must be verified in all climate zones
Insulation & Envelope
Higher wall insulation standards (R-15 for 2x4, R-21 for 2x6)
Stricter window U-factor requirements
Blower door testing with new multi-point option
Sampling Rules
Sampling is still allowed for new construction, but QA requirements are stricter
One QA audit for every 100 dwelling units in a development
Providers audit both tested and untested units
ECC / HERS Tests Commonly Required on Multifamily Projects
Pacific Airflow performs all required multifamily field verifications, including:
Blower Door Testing (Building Envelope Leakage)
Duct Leakage Testing
Refrigerant Charge Verification
Fan Efficacy (Fan Watt Draw)
Quality Insulation Inspection (QII)
Domestic Hot Water Pipe Insulation Verification
Ventilation System Verification
All testing is registered with the ECC Provider (CHEERS) and accepted by building departments across Northern California.
Preventing Delays on Large Projects
On multifamily projects, delays typically happen because:
Ventilation design doesn’t meet new code
Insulation installation fails QII
Duct systems fail leakage tests repeatedly
Refrigerant charge is not set properly on multiple units
Sampling documentation is incomplete
QA audits uncover data errors
We work directly with crews and site supervisors to catch issues early while they are easy to fix.
Working With Builders, HVAC, and Insulation Contractors
Pacific Airflow acts as a code partner on multifamily projects by:
Coordinating testing schedules across many units
Helping crews understand what will pass before testing begins
Providing fast documentation for inspection
Communicating directly with site supervisors and project managers
Keeping projects moving instead of creating bottlenecks
Why Builders Choose Pacific Airflow for Multifamily
Experienced with large unit counts and sampling protocols
Deep understanding of 2025 ECC changes
Fast turnaround for documentation
Clear communication with job sites
Focused on keeping projects inspection-ready
Schedule ECC / HERS Testing for Your Multifamily Project
If you are building or managing a multifamily project in Northern California, ECC / HERS verification will be a critical part of keeping your project on schedule.
Pacific Airflow is your local multifamily ECC / HERS testing partner.
Contact us today to coordinate testing for your project.